Objective


The mission of L&D Johnson Plumbing & Heating Inc. is to provide a reliable service, maintain our hard working standards to better serve the public sectors. We stand behind our service and are a Certified Contractor SDVOSB, MBE, DBE & 8(A) Contractor.


Experience

  

Start Nov. 2007 (Ongoing) Burgard High School Buffalo, NY

Building Reconstruction

Construction for this project includes a remodel of the plumbing system, toilet room updates, building addition, a new hot water heating system and new water boosting system.
Contact: Dan Stevens
 Contract Amount $1,077,481.00
Subcontractors
       Frontier Insulation Buffalo, NY/CEM Inc. Grand Island, NY

 

 

Start March 2007 (Ongoing) Veterans Affairs  Bath, NY

HVAC 5th Floor & Renovate Bldg. 76

All renovations to be done on this project include demolition, asbestos removal, the gutting and remodeling of the 5th floor. Plumbing and electrical renovations as well as sprinkler system upgrades are being completed to be brought up to code. The HVAC contract includes new chiller and all the necessary piping.
Contracting Officer: Mark Simonson 
HVAC Contract Amount $1,015,250.00 / Renovate Contract Amount $1,502,482.00
 

Subcontractors: Frey & Campbell Hammondsport, NY                                                       

John Mills Electric Elmira Heights, NY

Trane Co. Rochester, NY

Keuka Construction Corning, NY

Metro Environmental Niagara Falls, NY

  

Start July 2007     (Completed) Veterans Affairs Canandaigua, NY

Upgrade Boiler Controls

Job included the installation of Plant Master Controllers, and Circular Chart Recorders for all three boilers. The Feed water Pumps were replaced as well as the controllers. A front panel insert was provided for plant master controls. This insert was delivered with the PCC-III controller re-wired and factory tested. A separate sub plate with the terminals was also provided pre-wired to the controller. Installation of equipment was handled by subcontractors T-Bell and Concord that was supplied by B.J. Muirhead.
Contracting Officer: Chris Hall  Contract Amount $416,016.00
Subcontractors
B.J. Muirhead Orchard Park, NY
T-Bell Rochester, NY
Concord Electric Rochester, NY

Start January 2008 (Ongoing) University At Buffalo Buffalo, NY

Eliminate Cuspidors

Work Consists of removal of cuspidor drain piping, installation of pipe plug at sanitary piping associated with each cuspidor drain and other work as indicated to abandon the cuspidors. Removal of sink drain as indicated, insulation of new Schedule 40 PVC drain piping of equal or greater diameter, connection of sink drain piping to the existing sanitary drain pipe, and other work as required. Collection of abandoned (removed) copper piping, transportation of abandoned copper piping from the site, and the proper disposal of abandoned copper piping. Verification of the proper operation of the sink drainage system and the institution of any required repairs.

Contact/Project Manager: Don Johnson  Contract Amount $125,555.00
No Subcontractors – All work handled by L&D Johnson Plumbing & Heating, Inc.

 

Start December 2007 (Ongoing) University At Buffalo Buffalo, NY

Replace Dental Chair Drains

This is an extension of the Eliminate Cuspidor Job which includes the installation of Amalgam Separation System. This involves Fabrication of Wastewater Surge Tanks, support frames and Automatic Control Panels. Acquisition of Wastewater Transfer Pump Unit, electrical components and materials, piping, fittings, and all necessary materials. Installation of Wastewater Transfer Pump Unit, gravity drain piping from the area of the existing Vacuum Pumps to the Wastewater Transfer Pump Unit, and all equipment, components, and devices as required to install the drain piping from the general area of the discharge points of at the existing Vacuum Tank, to the Wastewater Transfer Pump Unit.
Contact: Ronald Molina  Contract Amount $184,049.00
Subcontractor
O’Connell Electric Lancaster, NY

 

Start September 2007 (Ongoing) Watervliet Arsenal Watervliet, NY

Replace A/C Chiller Building 124

Job consisted of removal of one Dunham-Bush 75 Ton Chiller. This included asbestos removal, air accumulator and refrigerant tanks, supports and accessories, head pressure controls, water circulating pump, air cooled condensers on the outdoor platform, all refrigerant piping between chiller and condenser, all power and control conduits, including wiring and supports between the chiller and condenser, main chill water pump supply and return shutoff valves, piping, pressure gages and accessories. A new 75 ton air cooled hermetic centrifugal compressor water chiller. Concrete pad was modified and all of the above stated items were replaced.

Contracting Officer: Melanie Keith  Contract Amount $241,828.00
Subcontractors
Mollenburg Betz Buffalo, NY
Farina Electric Mechanicville, NY
Adirondack Heat & Frost Albany, NY                                                                          

Magnum Environmental Services Troy, NY

Start May 2007 (Completed) Watervliet Arsenal Watervliet, NY

Replace Steam Heat System Building 110

This is a teaming Contract with Rand & Jones. It consisted of labor, materials, equipment, facilities, supervision, testing and all related costs to replace the heating system for building 110. Removal & disposal of heating system pipes & fittings wrapped with asbestos containing insulation. Starting at the main steam and condensate lines removal & disposal of all piping, fittings, insulation, and unit & fin tube heaters, and their associated controls. Install new heating system components to replace the heating system that was removed. New components include piping, fittings, insulation, controls, and unit & fin tube heaters. Provide operation and maintenance manuals and training to Watervliet Arsenal maintenance personnel on the new heating system. Provide as-built drawings.

Contracting Officer: Melanie Keith Contract Amount $1,144,399.00
Subcontractor
TriValley Plumbing & Heating Schenectady, NY 

 

Start September 2007 (Completed) Niagara Falls Air Force Base Bldg 860  

(Subcontractor for Rand & Jones Niagara Falls, NY)

Replace Hot Water Heating System

L&D Johnson Plumbing & Heating, Inc. was subcontracted through Rand & Jones to remove the existing Hot Water Heating and replace the entire system. This included the baseboard & make up air unit. Subcontractors were contracted to complete the Insulation and Duct work.

Contact Joan Yang  Contract Amount $102,510.00
Subcontractors
Frontier Insulation Buffalo, NY

Lovejoy Metals Buffalo, NY

 

Start May 2007 (Completed) Watervliet Arsenal Watervliet, NY

Replace Steam Heat System Building 110

This is a teaming Contract with Rand & Jones. It consisted of labor, materials, equipment, facilities, supervision, testing and all related costs to replace the heating system for building 110. Removal & disposal of heating system pipes & fittings wrapped with asbestos containing insulation. Starting at the main steam and condensate lines removal & disposal of all piping, fittings, insulation, and unit & fin tube heaters, and their associated controls. Install new heating system components to replace the heating system that was removed. New components include piping, fittings, insulation, controls, and unit & fin tube heaters. Provide operation and maintenance manuals and training to Watervliet Arsenal maintenance personnel on the new heating system. Provide as-built drawings.

Contact: Melanie Keith  Contract Amount $1,144,399.00
Subcontractor
TriValley Plumbing & Heating Schenectady, NY 

 

 

Start September 2007 (Completed) Niagara Falls Air Force Base Bldg 860  

(Subcontractor for Rand & Jones Niagara Falls, NY)

Replace Hot Water Heating System

L&D Johnson Plumbing & Heating, Inc. was subcontracted through Rand & Jones to remove the existing Hot Water Heating and replace the entire system. This included the baseboard & make up air unit. Subcontractors were contracted to complete the Insulation and Duct work.

Contact Joan Yang  Contract Amount $102,510.00
Subcontractors
Frontier Insulation Buffalo, NY                                                                                     

Lovejoy Metals Buffalo,

 

  

Start July 2005  (Completed) Waterfront School 95 Buffalo, NY

Plumbing Renovate

Construction for this project involved the plumbing system renovate, toilet room updates and renovations. Sprinkler system re-vamped up to code and the hot water storage tank was drained down for inspection. 
Contact: John Robinson  Contract Amount $1,473,879.00

Subcontractors

Davis Sprinkler Buffalo, NY                                                                                                  

WC Roberson Plumbing & Heating Buffalo, NY 
 

Diversified Buffalo, NY

 

Start March 2007 (Ongoing) Veterans Affairs  Bath, NY

HVAC 5th Floor & Renovate Bldg. 76

All renovations to be done on this project include demolition, asbestos removal, the gutting and remodeling of the 5th floor. Plumbing and electrical renovations as well as sprinkler system upgrades are being completed to be brought up to code. The HVAC contract includes new chiller and all the necessary piping.
Contact: Mark Simonson 
HVAC Contract Amount $1,015,250.00 / Renovate Contract Amount $1,502,482.00

Subcontractors

Frey & Campbell Hammondsport, NY                                                                                   

John Mills Electric Elmira Heights, NY                                                                                   

Trane Co. Rochester, NY Keuka Construction Corning, NY                                            

Metro Environmental Niagara Falls, NY

 

 

Start May 2007 (Completed) Watervliet Arsenal Watervliet, NY

Replace Steam Heat System Building 110

This is a teaming Contract with Rand & Jones. It consisted of labor, materials, equipment, facilities, supervision, testing and all related costs to replace the heating system for building 110. Removal & disposal of heating system pipes & fittings wrapped with asbestos containing insulation. Starting at the main steam and condensate lines removal & disposal of all piping, fittings, insulation, and unit & fin tube heaters, and their associated controls. Install new heating system components to replace the heating system that was removed. New components include piping, fittings, insulation, controls, and unit & fin tube heaters. Provide operation and maintenance manuals and training to Watervliet Arsenal maintenance personnel on the new heating system. Provide as-built drawings.

Contact: Melanie Keith  Contract Amount $1,144,399.00
Subcontractor
TriValley Plumbing & Heating Schenectady, NY 

 

 

Start Nov. 2007 (Ongoing) Burgard High School Buffalo, NY

Building Reconstruction

Construction for this project includes a remodel of the plumbing system, toilet room updates, building addition, a new hot water heating system and new water boosting system.
Contact: Dan Stevens  Contract Amount $1,077,481.00

Subcontractors

Frontier Insulation Buffalo, NY  / CEM Inc. Grand Island, NY

 

 

Start June of 2008 (Ongoing) Newfane Schools Newfane, NY

Plumbing Renovate & Sprinkler Job

A complete remodel of 14 large Toilet Rooms with the replacement of approximately 75 fixtures, which included all new waste & vent and water piping. At the same time, all water and sewer piping was replaced within the building,   including tank realignment. Two brand new water services were installed in multiple buildings. All new sprinkler system installed in two staging areas within two schools.

Contact: Bill Albers with Cannon Design Construction Services Contract Amount $859,370.00

Subcontractors

Allied Fire Protection Systems, Inc.  – Contact John Carlson 
              

VJ Stanley – Contact James Pellegrino

Plumbing Foreman – Kevin Johnson

Project Management – Don Johnson

 


Start April 2008
(Ongoing) Veterans Affairs Sprinkler Buffalo, NY

Correct Sprinkler Deficiencies

Provide all labor, materials, equipment, and supervision to CORRECT SPRINKLER DEFICIENCIES at the VA Western New York Healthcare System in Buffalo, NY. Updating Sprinkler Systems coordinating five different sub-contractors to upgrade the sprinkler system after demolition of the old system. This includes demolition of the generator and underground storage tank and replacement of the fire pump. Coordination of this project consisted of extensive cooperation of the entire hospital staff due to the large nature of the project.

Contracting Officer: Jonathan Aiken                                                                            

Contract Amount $1,089,082

Subcontractors

Bill Holmes Backhoe & Bulldozing – Bill Holmes

Davis Fire Protection & Services, LLC – Mark Jarnot

Eastern Tank Services                                                                                                       

Frey Electric Construction Co. Inc. – Salvatore Sciandra                                                 

U&S Services Inc. – Dan Paul                                                                                        

Frontier Insulation – George Camann                                                                                  

Bill Holmes Excavation Service  - Bill Holmes                                                                   

Metro Contracting & Environmental, Inc. – Harold Hibbard

Project Management – Don Johnson

Field Supervisor – Jim Racinowski